Skip to content
Basement Renovations
Mississauga

Our solution

Legal Second Unit Design and Build in Mississauga, ON

Legal second unit design and build covers the plan, permit and construction of a basement apartment from start to inspection. Basement Renovations Mississauga manages each stage under one project plan.

Get a free quote

Tell us about your basement. We reply with the next step.

Main service
Part of our legal basement apartments service.

Basement apartment bedroom with an egress window and a ceiling smoke alarm

What the Unit Includes

  • Separate entrance
  • Bedroom with an egress window
  • Kitchen and bathroom
  • Fire separation and soundproofing
  • Interconnected alarms
  • Separate heating and electrical panel

Build Stages

  1. 1Review zoning and the basement.
  2. 2Design the layout and prepare drawings.
  3. 3Apply for the building permit.
  4. 4Repair moisture and structure.
  5. 5Frame, rough in and pass inspections.
  6. 6Finish and complete the final inspection.

Related Pages