Our solution
Legal Second Unit Design and Build in Mississauga, ON
Legal second unit design and build covers the plan, permit and construction of a basement apartment from start to inspection. Basement Renovations Mississauga manages each stage under one project plan.
Main service
Part of our legal basement apartments service.

What the Unit Includes
- Separate entrance
- Bedroom with an egress window
- Kitchen and bathroom
- Fire separation and soundproofing
- Interconnected alarms
- Separate heating and electrical panel
Build Stages
- 1Review zoning and the basement.
- 2Design the layout and prepare drawings.
- 3Apply for the building permit.
- 4Repair moisture and structure.
- 5Frame, rough in and pass inspections.
- 6Finish and complete the final inspection.